New industry Technology regarding to Bussmann fuse, ABB breakers, Amphenol connectors, HPS transformers, etc.
Motor Starting · Combined Protection
A soft starter is almost never installed alone. It sits behind a short-circuit protective device and in front of a motor that needs overload protection, and the three parts must be selected together. This guide covers the pairing of Eaton S811+, S801+ and DS7 soft starters with PKZM motor protective circuit breakers, and the coordination checks that decide whether the combination survives a fault.
Soft starters are bought for one reason: to reduce the mechanical and electrical stress of starting. That same reduction changes the duty of every device around them. The start current is lower but lasts longer; the thermal load on the motor is different; the short-circuit protective device must still clear a fault that the soft starter is bypassing at the time.
The result is that a soft starter selection cannot be finished without the protective devices, and the protective devices cannot be finished without knowing the starting profile. This article treats them as one selection.
| Device | Protects | Sized by |
| Fuse or MCCB (SCPD) | The soft starter's thyristors and the cable | The starter's published SCPD table, not the motor current |
| Soft starter | Controls voltage ramp; provides run/stop and often bypass | Motor full-load current and start duty |
| PKZM / overload relay | The motor against overload and phase loss | Motor full-load current, with the class set by start time |
The first row is where most installations go wrong. The SCPD for a soft starter is specified by the starter manufacturer in a table indexed by starter rating, because the thyristor's I²t withstand — not the motor's current — sets the requirement. A fuse chosen for the motor will often be too large to protect the thyristors, and one chosen for the thyristors may be too small to carry the motor current without nuisance operation.
A direct-on-line start draws 6–7 × FLC for a few seconds. A soft start draws perhaps 3–4 × FLC for longer — often 15–30 seconds for a high-inertia load. The heating effect on the fuse is the integral of current squared over time, so a longer, lower start can deposit as much energy as a shorter, higher one.
| Starting method | Typical current | Typical duration | Fuse consideration |
| DOL | 6–7 × FLC | 2–8 s | Short, high peak; aR or gG both viable |
| Soft start | 3–4 × FLC | 10–30 s | Lower peak but longer; check the I²t, not the peak |
| Star-delta | 2–3 × FLC | 5–15 s | Transition spike can trip a marginal fuse |
| VFD | 1–1.5 × FLC | Continuous ramp | aR only; gG will not protect the rectifier |
For a soft starter the practical consequence is that a fuse sized exactly on FLC may operate during a long ramp, particularly in a hot enclosure. The manufacturer's SCPD table usually already accounts for this, which is another reason to use it rather than a calculation.
A PKZM motor protective circuit breaker combines short-circuit protection (magnetic) with adjustable overload (thermal) in one device. The two functions use different references:
PKZM0 covers the small motor range up to about 25 A, and the larger frames extend the range upward. The setting dial is calibrated for a 40 °C ambient; in a hotter panel the set point must be adjusted or the device derated.
IEC 60947-4-1 defines two coordination levels between the SCPD and the starter:
| Type | After a short circuit | Practical meaning |
| Type 1 | Damage to the starter is acceptable; it may need replacement | Cheaper SCPD, higher downtime after a fault |
| Type 2 | No damage other than contact welding that can be cleaned | Faster restart; requires a faster SCPD |
The starter manufacturer publishes the fuse or breaker types that achieve each level. Specifying “Type 2” without using the listed device does not achieve it; the coordination is a tested combination, not a calculation.
A 55 kW pump motor at 400 V draws about 100 A full load with a 25-second ramp. Direct-on-line would exceed the supply's starting current limit, so a soft starter is specified.
Step 1: starter rating. The starter must carry 100 A continuously and provide enough torque for the ramp. A unit rated for the next frame above 100 A is selected.
Step 2: SCPD. The starter's table for that frame lists specific fuse and breaker options for Type 1 and Type 2 coordination. Choosing Type 2 for a pump that must restart quickly selects a faster fuse, at a higher cost.
Step 3: overload. A PKZM sized to bracket 100 A, set at 100 A in the middle of its range, mounted adjacent to the starter.
Step 4: thermal. The starter dissipates heat during the ramp, the PKZM dissipates a little continuously, and the fuse dissipates continuously. In a sealed enclosure the three together often decide the enclosure size.
Step 5: the bypass contactor, if used, is rated for the motor current and switched after the ramp — its coil and auxiliary contacts follow the rules in the contactor article.
Can a soft starter run without a bypass contactor?
Yes, but the thyristors then carry the full motor current continuously and dissipate more heat. Bypass is usual above a certain rating for thermal reasons.
Does a soft starter reduce the fuse rating?
It can reduce the starting current, but the SCPD requirement is set by the starter's own withstand. In many cases the fuse required is the same or larger than for DOL, not smaller.
Can I use a PKZM instead of a fuse plus relay?
Yes, and it saves panel space. It must be one of the types the starter manufacturer lists for the coordination level required.
What class overload for a 25-second ramp?
The class must cover the ramp without tripping. Class 10 covers most pump starts; longer ramps may need Class 20 or a higher class device.
Soft starter selection is a three-device problem. The SCPD follows the starter's table, the overload follows the motor's current with the setting in the middle of its range, and the starter itself follows the starting duty. The coordination level — Type 1 or Type 2 — decides which combination is acceptable, and it is a tested combination rather than a calculated one.
Get the order right: starter, then SCPD from its table, then overload, then thermal and mechanical. The reverse order — starting from the fuse you already stock — is how panels end up with a correctly rated fuse that does not protect the thyristors it is meant to protect.
New industry Technology regarding to Bussmann fuse, ABB breakers, Amphenol connectors, HPS transformers, etc.